- Locate the task in the list.
- In the 'assigned to' column click on your staff picture.
- In the drop-down that opens a progress bar is shown. Select the spot in the bar that shows the percentage complete for the task.
- The task color extends to the selected point of the bar, to shows the team much of the task works that you have completed.
Comments
0 comments
Please sign in to leave a comment.