Quickly add stages or tasks on the fly as you are submitting your weekly timesheets.
This feature is available to people with Project Manager staff security level or higher, who can add stages and task within the project. New stages are added with the fee type 'hourly rate' assigned. This can be changed later in the project work breakdown tab if needed.
Add an extra stage or task by:
- In timesheets click into the drop down list.
- Scroll to the end of list of existing items.
- Click Add in the open drop down, or press CTRL A when the stage or task drop down is open.
- Type the name of the new stage or task.
- Click save.
Comments
0 comments
Article is closed for comments.